SEA LOUNGE
With pride, we present you the new “Sea Lounge” project in the environmentally friendly, family district of Alania - Avsallar. The Avsallar region is ideal for the construction of a new house, because It can easily be called a family area due to its calm measured rhythm of life, developed by the infrastructure of the district, the famous and best beach of Alania - 1.5 km of a sandy coastline with a gentle entrance, green coniferous vegetation and proximity to 2 international airports.
The complex is very cozy, thanks to its location and compactness: on a land plot with an area of 1.028 m2, we are building a modern project for 1 residential block for 25 apartments (5 apartments on each floor) and the modern infrastructure of a five -star hotel. The project plan includes the most popular and practical types of apartments. Among 25 available apartments you will find a layout to your taste:
1 + 1 (50 m2) - apartments with one bedroom + kitchen in the American style (combined kitchen with the living room), 1 bathroom and 1 balcony;
2 + 1 Dublex (110 m2) - two -story apartments on the two upper floors with two bedrooms + a kitchen in the American style (combined with the living room), 1 bathroom, 1 guest toilet, 1 balcony and 1 terrace on the top floor.
Starting from the 3rd floor from the apartments, a panoramic view of the sea, a pine grove and the entire Avsallar region! When buying an apartment at the construction stage, you get the opportunity to really invest in real estate, because the value of real estate is several times lower at the construction stage, which means it is more profitable; It is possible to buy an apartment in an interest -free installment plan for 1 year with an initial contribution of only 30%; You get an apartment in a new building built according to the latter technology and completely ready for operation (in full finishing, with a kitchen set with niches for household appliances, with furniture and plumbing in bathrooms).
When booking and drawing up the contract, the cost is recorded and the schedule of interest -free installment until the end of construction is painted.
Start of construction: September 2022
End of construction: September 2023